Try Free

How Elon Musk Just Broke Every Data Center Rule

Anastasi In Tech November 26, 2026 29m 4,668 words
▶ Watch original video

About this transcript: This is a full AI-generated transcript of How Elon Musk Just Broke Every Data Center Rule from Anastasi In Tech, published November 26, 2026. The transcript contains 4,668 words with timestamps and was generated using Whisper AI.

"SpaceX just did the impossible. A rocket company is now the fastest AI data center builder on Earth, and it's doing it in America, where a permit can take years and a grid connection even longer. This is Starbase, where SpaceX builds and launches Starship. In August, this land was empty dirt. Four..."

[00:00:00] Speaker 1: SpaceX just did the impossible. A rocket company is now the fastest AI data center builder on Earth, and it's doing it in America, where a permit can take years and a grid connection even longer. This is Starbase, where SpaceX builds and launches Starship. In August, this land was empty dirt. Four weeks later, two AI data centers were rising out of it. And it's not the only one. Around Memphis, there are six more sites with close to a million GPUs. Altogether, that's around 2 gigawatts, the output of two nuclear reactors. So where do you get all that power? My name is Anastasi, and I've been designing advanced chips for over a decade. And this story gets stranger the closer you look. Some of these chips deliberately burn electricity doing nothing. They're barely using the compute they already have, yet they're building faster than ever. So in this video, I will show you how SpaceX hacked all the rules of building data centers, how they built this fast, and why a space company needs so much compute on Earth. Let's find out. Let's go back to where it started. An abundant Electrolux factory in Memphis, Tennessee. In 2024, Musk's company moved in. They packed the factory with 100,000 NVIDIA GPUs, all were together as one giant cluster. They called it Colossus, and it was built for one job – training Grok. 92 days later, it has doubled to 200,000. Today, it doesn't train Grok at all. To see how crazy that is, look at everyone else. A modern AI data center usually takes 18 to 24 months to build. Take Stargate in Abilin, America's flagship AI project. It's OpenAI's gigawatt-scale campus on the Texas plains, and it took about 15 months from groundbreaking to its first compute-going life. Even China, the country famous for building at insane speed, spent about a year for Envision's Galaxy campus in Inner Mongolia. Colossus took 122 days. By the time Stargate had finished pouring its foundations, Colossus was already training. It's a whole different league. And somehow, they've been speeding up ever since. And you might think reusing the old factory explains it. Well, it saved them the foundations. But on a project like this, it's not where the time goes. At this scale, one problem comes before all of them. Power. Colossus needed about 150 megawatts, roughly what a small city uses. The site had 8, and the local utility could stretch that to 50, eventually. Anything more meant approvals, new high-voltage lines, and a brand-new substation. All of that on utility schedule, not masks. So they decided not to wait for the power company and brought in their own power plant. Picture a jet engine that never leaves the ground. It burns gas, and instead of pushing a plane, it spins a generator. And these ones arrived on trucks. They were parked next to the factory, hooked up to a gas line, and switched on. And the site had one more secret. This used to be an oven factory, and a plant like this runs on gas. So the gas line was already there. The turbines burn that gas and electricity go straight into the GPUs. Every data center has generators, but they're a backup. They sit there for years, waiting for a blackout that almost never comes. At Colossus, the backup was the main power, and they didn't stop at a few. By the spring, there were 35 turbines on the side with about 421 megawatts of capacity. That's almost three times what this supercomputer needed. So the GPUs were running even before the power plant that was supposed to feed them even existed. The grid caught up later. XAI even paid for the new substation itself. By May 2025, the site was getting 150 megawatts from the grid. And by then, Colossus has been running for months. Then they did it again. Much bigger. Colossus 2 is a million square foot warehouse a few miles away. Its first cluster has over 100,000 NVIDIA Blackwell chips, drawing around 200 megawatts. More than the first Colossus ever needed. And how much was the power company supplying to that building? Half a megawatt. Enough for a co-working space. It came online in 91 days anyway. So where do you get 200 megawatts when the grid gives you half of one? This time the trick was a map. The data center sits in Memphis, right on the Tennessee state line. The power plant doesn't. XAI put its gas turbines a few miles south, in South Haven, Mississippi, and sent the electricity back across the border. That matters because a power plant gets its permits from the state it's building. So Mississippi made the call and the Tennessee neighbors had no say. Then on the same campus, they added another 110,000 GPUs. This time NVIDIA's newer GB300s. That took 64 days. And they didn't stop there. Since then, they've been turning almost anything around Memphis into a data center. A mile south across the state line and all logistics warehouse became macro harder. Next door to Colossus 2, an empty lot became Mini Heart, a four-story tower in five months. In South Haven, an old police and fire training ground is becoming a data center called gun range. Like Macro Harder and Mini Heart, it's built for about 220,000 NVIDIA GB300 GPUs. And the strangest one is an old warehouse that used to store canned meat. Work started there on October 5th and the first holes are supposed to switch on in December. About 60 days, half the time of the first Colossus. Put it all on the map and you get close to a million GPUs on one industrial strip at the age of Memphis. But here is what doesn't add up. Reports suggest that their current GPU utilization is just about 11%. Its GPUs are doing about a tenth of the work they could do. Even the best AI labs struggle to get past 40%. Colossus doesn't even train Grog anymore and some of the newer buildings may not have enough power to run at full load. And yet they kept building faster than ever. But why? Keep that question in mind. But first, let's look at how can you build a data center in just 60 days. The first trick is simple. They throw out the order. A normal project is a relay race. You do design and then permits, construction and then power, equipment and testing. Here they all start running at once. At the spam warehouse, crews were still working on the building when the trucks pulled up with batteries and chillers. Cooling went in at one end while the walls were still going up at the other. And they don't wait until the end to switch on. A normal data center comes on all at once, like flipping a light switch when the project is done. Here, as soon as the hole is finished, it starts running while the crews move on to the next. That means the power demand shows up on day one and grows with every hole they finish. And this is where it gets hard. I've spent my career designing chips and in my world we fight over milliwatts. So let me show you what these numbers actually mean. The original Colossus ran on 100,000 H100 GPUs. Each one burns about 700 watts and the whole side needed 150 megawatts. The new chips are hungrier. A GB300 rack packs 72 GPUs into one cabinet taller than me and as heavy as a car and that cabinet pulls about 132 kilowatts. That's roughly what a hundred homes use in a single box. But that's on a normal day. When thousands of GPUs spike all in one moment, a rack can heat above 150 kilowatt. That's why vendors tell customers to wire each rack for over 190. Now, remember MiniHeart right next to Colossus 2. It's built for 220,000 of these GPUs. That's about 3,000 of these racks and over 400 megawatts. That's twice the GPUs of the original Colossus and almost three times the power in one building. And here is the strange part. On paper, these chips is an efficiency miracle. Blackwell Rack can do the same AI work as Hopper with up to 25 times less energy. So why does every new data center needs more and more power and not less? Because nobody spends savings on saving. If an answer costs 25 times less energy, you train a bigger model and you let the model think longer. In AI, efficiency doesn't shrink demand. It fits it. But the amount of electricity is only half of the problem. The other half how the chips use it. And that power does not flow steadily. In training, the GPUs calculate, then wait while they exchange results, then calculate again. Thousands of chips computing together. So the power doesn't harm. It pulses. Picture a whole city turning its lights on and off together every few seconds. Now put numbers on that. An H100 can drop from about 700 watts to 140 in a few milliseconds. Across 50,000 GPUs, that's a swing from roughly 35 megawatts to 7. And it can happen again and again throughout a training run. Getting enough electricity into the building is one problem. Getting the equipment, supplying it to handle that rhythm is another. Microsoft, OpenAI and Nvidia studied exactly this and they published this paper. This is a measured power from a training job on H100 racks. The peaks are the GPUs calculating. The values are the pauses while they exchange results. Notice how they move together. Their demand doesn't average out into a nice steady line. It rises and falls as one enormous load. And the researchers here cite Colossus as a real-world example of that challenge. And here is how this becomes the problem. Some of those power swings happen between once every few seconds and a few times a second. That can overlap with the natural oscillations of generators and wider power system. Think of pushing a swing. Get the timing right and every push adds to the last. Except here you're pushing on the turbines, powering a supercomputer. The repeated changes can stress turbine shafts and disturb voltage and frequency. If those disturbances become severe enough, protection systems can start disconnecting equipment. And in a few seconds the whole site can go dark. On the public grid a shock like this gets spread across hundreds of power plants. On your own power plant nobody else is there to absorb it. So building your own power plant doesn't make this problem go away. You just own it now. And one of the fixes is wonderfully absurd. You make these chips to do work for nothing. I will show you how in a moment. But first, something I've been building. When someone asks perplexity who to watch to understand how chips and AI infrastructure actually work, I want to be the answer. I've been building a platform for an syntax with Lovable. And I told Lovable my goal: become a go-to answer for chip design questions. Lovable lets you build software by describing what you need in plain language. I'm using it to create a place where new viewers can explore my work and potential partners can connect with me. But a big part of that is being discoverable in search engine and AI tools. For me, that means clearly explaining my background, the topics I cover, and the interviews and research papers I explore so people know what to expect. Then I use Lovable SEO and AI search review to check the technical side. It flags issues and I can ask Lovable to fix them right there in the chat. That's what makes its growth tools so useful. I can build the site, improve how people discover it, and track where my visitors come from all in one place. I've already put the work into my research and now it actually gets found. If you have a business, a project, or an expertise you want people to discover, build it yourself with Lovable. And make sure to use the link in the description box below to get $5 off. So how do you stop the power from plunging every time the GPUs pause? You give them fake math. Engineers build software that fills those pauses with calculations nobody needs, just to keep electricity consumption steady. Now Nvidia puts the same idea into the chip. When useful work drops, the firmware can keep the GPUs burning up to 90% of its maximum power anyway. Now look at this line, it's much smoother. And just like that, the power system gets a steadier load, but the customer gets a bill for the calculations nobody asked for. In Microsoft work, that approach used about 10% more electricity. And this is the same industry that tells us that there is not enough power to go around. But wasting electricity isn't the only way to smooth the load. You can store energy during the pauses and release it when the GPU is needed again. Let's start inside the rack. Nvidia GB300 racks have capacitors built into their power shelves. When demand drops, the capacitors charge. When demand surges, they discharge. That helps smooth the load seen upstream with peak reduction of up to 30%. And that helps because it sits between the GPUs and the power grid. The GPUs keep swinging, but the plant only ever sees a steady draw close to the average. But capacitors only cover small fluctuations. For longer gaps, you need a bigger buffer. At Colossus, that means Tesla Megapacks. And remember where Colossus 2 gets its electricity? A dedicated gas plant across the state line in South Haven. When you rely on your own turbines, you have to manage how much of the swing reaches them. And the batteries sit between those two worlds. SpaceX says the batteries store enough energy to power the whole of Memphis for two hours. That gives you a sense of the scale. But their job isn't simply to keep the computers running during an outage. They also keep the computer's heartbeat away from the turbines. And when the power itself runs short, there is one more lever left on the chip itself. You don't have to switch the GPUs off. You can just slow them down. From the chip design theory, we know that you can lower the clock and you can lower the the voltage too and that power drops much faster than performance does. The last 10% of speed can cost 20 or 30% more power. So when a cluster nears its electrical limit, software lowers the GPU's power caps instead of killing jobs. A power shortage doesn't have to mean dark holes. It can mean every GPU's running a little slower. But someone has to slow down. First, a chatbot serving millions of people can't. An internal training run can pause and catch up overnight. So paying customers will likely get firm power while training runs take a hit. And the batteries bite the hours in between. And even that has a price. Right now, Antropic pays SpaceX about $1.25 billion a month. That's roughly $41 million a day. And starting this December, the bill can climb to about $100 million a day. Remember the question from Memphis: why keep building in this insane speed if you're barely using compute you already have? Because Grok isn't the only customer. Colossus One, the cluster built to train Grok, now runs Antropic models. And Google is buying the compute too. That changes how you look at these buildings. For Musk, opening early means getting paid while everyone else is still waiting. And look at what that speed cost. Antropic, together with Google, pays SpaceX over $70 million a day for the cloud. One of the biggest cloud companies on Earth is paying a rocket company for computers. Why would Google need SpaceX compute? It's almost absurd. Google designs its own AI chips. It's spending around $200 billion on infrastructure this year alone. And it still can't keep up because the compute it has today was decided back in 2024. They use SpaceX Cloud as a short-term solution until they get the data centers fully connected. The same problem as in Memphis. They agreed. And SpaceX builds its own power and isn't waiting for anyone. But here it gets more interesting. In Memphis, everything was borrowed: an old factory, an existing gas line, and a state border. But the next site borrows nothing. Go 800 miles southwest, to the tip of Texas, where the land runs out at the Gulf. This is Starbase, where SpaceX builds and launches its rockets. And close by, two AI data centers are rising out of the dirt. In late August, that was cleared ground. By late September, it has steel and roofs. A month later, mobile generators started rolling in. Most data centers lock in their power years ahead. Typically, you apply to the utility, wait in the queue, then build. SpaceX does it other way around. It starts building first and then adds power as the site takes shape, using whatever it can get fastest. Mobile turbines now, a permanent gas plant later. A public notice from the city of Starbase spelled out the plan. A gas-fired power plant and a supercomputer facility starting at 24 billion dollars. Texas has post new data centers from connecting to its grid. But this one doesn't need to. Bronzeville next door was getting ready to post data centers too. Three days before it started, SpaceX had the land moved out of the city and offered 220 million dollars for Bronzeville water system in return. Now it sits inside Starbase, SpaceX's own town. So why here, at a rocket factory at the Mexican border? When you prompt an AI, the answer has to reach you fast. That's why most data centers sit close to the big cities. But that's not what this one is for. Training doesn't care how fast the users are. What it cares about is power. And here, gas is the power. One of the big pipelines carrying Texas gas to Mexico already runs past Bronzeville. Starship burns huge amount of gas too. And two more pipelines are already being late. And some of the power might come from somewhere you've already seen. Remember the 69 turbines in Mississippi? Put the turbines on the side and switch on the computers. When permanent power arrives, load the turbines onto trucks and send them to the next site. And SpaceX is now hiring their own natural gas traders. Right here, next to the rockets. Why would a rocket company trade gas? Because here, gas is the electricity. Starship burns it and the data centers will burn it too. If the price spikes, the compute gets expensive. Well, that explains the gas, but it doesn't explain why a rocket company needs so much compute. For that, you have to look up. Most companies argue with utility about power. SpaceX looked up and said, well, fine, we'll use the sun. Can't get a grid connection and Texas built in orbit. There's no utility to ask. It sounds like a joke, but that's roughly Musk's argument. Earth simply doesn't have enough power. He wants to add another 200 gigawatts of AI every year. On average, the entire US uses about 500 gigawatts of electricity. So that's like adding 40% to America's electricity use every single year. And that is not going to happen, not on the ground. In space, a solar panel in the right orbit sees the sun almost all the time. Over here, it can collect several times the electricity of the same panel on Earth. Cooling sounds easy too, because you just radiate the heat into space. In reality, that's one of the hardest problems in the whole design. And if you want to know if the economics of data centers in space adds up, I have a full deep dive on that. The link will be up there. Then you have to get the hardware up there. That's what Starship is for. And Starship is built and launched right here. Now the details that ties it all together. SpaceX orbital computers are called StarMind. Each one is built around a space version of Nvidia's Rubin NVL72 co-designed with Nvidia. It's the same architecture expected to fill the data centers on the ground. So look at the Starbase again. That might be just a cash machine. Compute sold today on the same racks that will fly tomorrow. The first StarMind could launch as early as the third quarter of 2027. Still, for now, all of this compute lives on the ground. And every gigawatt of it competes for the same power, water, and land that people need. And right now, a lot of places are betting the machines are worth it. So is SpaceX. And right now, the bet is paying. But that whole business rests on one idea staying true. Compute is scarce. Customers are ready to pay a premium because they can't get this capacity anywhere else. But that won't last forever. Stargate, Fairwater, Galaxy. Every campus going up is helping end the scarcity SpaceX is selling. When they open, prices will fall. Then a new generation of GPU arrives, and this year's fleet looks old. And the contracts are short. And Tropic, the biggest customer, can walk away on 90 days' notice. So SpaceX is racing to cash in on a shortage. The rest of the industry is spending billions to end. And if you want to know what happens when market starts to doubt that shortage, it looks like this. But there is one shortage nobody can build their way out of fast. Even if the power arrives and the customers stay, a finished building can still sit dark. Because the electricity is useless without the energy chips to burn it. Every GPU in this story was bought from someone else. NVIDIA designs them. TSMC makes them. And every AI company on Earth is waiting in the same line. And this line is getting longer and longer. And the hardest part to get isn't even the GPU anymore. It's the memory stacked next to it. Samsung and Micron have already sold most of the next year's supply. The management of SK Hynix warns that the next year will be the worst year in the industry's history for supply. That could change the race again. For the last two years, the question was, who can get the power? For the next years, it may be, who can get the chips? SpaceX can't build a power plant in months. It can't build chips. Not yet. But it's going to try. Back to Texas. North of Houston, there used to be a coal plant. It shut down in 2018. But it left behind what a cheap factory needs most. A lake dug to cool it, the rights to pump that lake, power lines, and thousands of acres are already zoned for heavy industry. Memphis borrowed an old factory. This one borrows a dead power plant. On that side, SpaceX and Tesla are planning a cheap factory with more than 100 million square feet of space. TSMC's biggest fab is about 10 million. This is 10 times that. The goal is to manufacture 1 terawatt of AI compute a year. A leading edge TSMC fab makes roughly 30 to 40 gigawatts worth of chips a year. So to hit that goal, you would need about 30 of them. And the idea is extreme integration, logic, memory, packaging and testing on one roof. So a bare silicon can start here and end up as a finished product without ever leaving a factory. So what would it make? Not Nvidia GPUs. Two kinds of their own chips. An edge chip for Tesla's cars and robots and D3, a chip built for space. And buried in the files is something interesting, called a space compute test facility. When this project was first pitched to the county, it was pitched as a data center. Now it's officially a chip plant. So a project that started out using chips has turned out into a project that makes them. And I've made two deep dives on TerraFab. One on economics and another on engineering. And those are the most watched episodes on my channel. I will link it for you below. Now back to Starbase. Texas has posed new data centers from connecting to the grid. But a chip plant isn't covered. And this one plans to make its own power anyway, with gas turbines and batteries on site. Now look at the pattern. Wrenching turbines was too slow, so they bought a turbine company. Buying turbines was too slow, so now they are casting the blades themselves. The city said no, so they moved the land to another town. The neighbors sued, so they offered to buy the neighborhood. And now the bottleneck is chips, so they are going to make their own. When something blocks them, they don't wait. They build it themselves. When you don't take no for an answer, very little can stop you. The hardest part of a gas turbine is in the blades in the hottest section. Turbine makers can deliver everything else 12 to 18 months before the blades are ready. So SpaceX is building its own blade foundry in Bastrop, Texas, using the casting team it's built for rocket engines. Musk says that could bring turbines online up to 18 months faster. A power plant takes a month. A fab takes years. The first test chips are targeted for mid-2027, with volume production in 2028. And even then, they are not doing it alone. The manufacturing know-how with 14a process node is coming from Intel. So SpaceX has the power, the rockets, the land, and the AI. Now it's going after the chips. Everyone in this race is fighting for those same four things. But what happens when one company owns all of that? It gets to set the pace for everyone else. And it gets the cash. In this race, speed isn't set by your fastest part. It's set by your slowest one. Musk's answer every time is the same. If something slows you down, own it. And the rest of the industry is starting to do the same. Google bought a power company. Meta is paying a utility to build gas plants just for its campus. And OpenAI now designs its own chips. Across the United States, more than 130 gigawatts of private off-grade power has been proposed for data centers. AI used to be a software race. Now it's an industrial race. And the winner may be whoever owns the slowest piece. But this ownership comes with a huge risk. And the price SpaceX charges today only holds while compute is scarce. If the shortage ends, all of this turns into very expensive debt. Now step back and look at the bigger picture. These are the fastest data center builds in the world. Every day the world around us is being rebuilt. And it's happening fast. Watching this, engineering me is amazed. But then I look at this. I love technology. But I love this even more. If we are building all that intelligence for a better future, this has to be a part of that future too. And maybe this is the best argument for sending data centers to space. Let me know what you think. Share this episode with your friends. And now watch this one on how Japan has just reinvented chip making. Or this one on the chip factory that could save Moore's law. Love you you guys and I will see you there. Ciao!

Transcribe Any Video or Podcast — Free

Paste a URL and get a full AI-powered transcript in minutes. Try ScribeHawk →