Good afternoon, committee members and other participants. This is the Evaluation Committee Meeting for RFP 2600365 CDBGDR, Notice of Funding Availability for Small Multifamily Rehabilitation Projects. My name is Joe Wright, and I'm the buyer assigned to this project. This meeting is being held in front of the needs of communication media technology and has been publicly noted. Active participation will be for committee members only. Provisions have been made for any member of the public desiring to have access to view the meeting. The recording will also be available after the meeting has ended. If you're watching online today, please make sure that you mute your microphone and turn off your camera for the duration of the meeting. Janet, if you wouldn't mind, turn off the camera. I'll take care of it. Thank you. Thank you. Please be advised that the cone of silence is still in effect. All meetings and correspondence must include me. Again, for the record, this meeting is being recorded and it hasn't been publicly noticed. At this time, I will ask each committee members to introduce themselves for the record, beginning with the committee chairperson. I'm Angela Madero with Social Services Department. Perfect. I'm Connie McGarger with Facilities Management Real Estate Services Department. Erica Jeffries with Management and Building Grants Management Office. Charles with Central Services. Jessica Bermoschner with Social Services. Joseph Stokes with Affordable Housing. Thank you, everybody. On September 25th of 2026, the county received a total of three applications in response to RFP 2600365. Since housing's first steps forward was determined to be unacceptable, we will be discussing the remaining two applications today. The evaluation committee will discuss applications received in alphabetical order. Each proposal is to be evaluated based only on the information provided in the proposal as it correlates to the requirements and evaluation criteria set forth in the solicitation as well as the application. The committee will then agree upon a consensus score for each criterion. The evaluation committee chair, Angela, will go ahead and start today's discussion. So what I'll do is I'll read the section starting with the first component. We'll go around. I'll start with you and then we'll go around and circle everybody to say their score. And if we don't reach a consensus at that time, we'll dive into further discussion needed. So the first section is project, excuse me, project readiness and component one is for 10 points. And under the scope of work, did the applicant provide the name of the qualified general contractor? And for that, it would be 10 points. So 10 points score on that one. I have 10 too. I have zero for that one. I have zero for that one. I have zero. I have zero. I have zero. I have zero as well. I did notate as for mine because they did provide a license building contractor, but not a licensed general contractor. And just for the record too, I believe I forgot to mention this since we're starting alphabetical order, we're starting with our replace apartments. And this is for again, component number one. So it specifically says general contractor. And since it's not a general contractor, let's just that's why I did zero point. Okay, zero. So it would be zero points for component one. Okay, it's a certified builder can actually do the actual work, but it's just not an actual general contractor there. So the question just may probably need to be up here in the sense of the actual work being done. Component two is for a max of 10 points. And in order to receive the full 10 points, both must be true. The project under project information, the applicant certified that they provided the appropriate documentation for attachment 12 and attachment 12 shows that they have provided a complete and accurate permit ready or permits not ready form. The other option is for five points that they certified that they have the information and attachment 12 and that they have provided a application permitting a submitted form. Zero for that one. Zero. Zero. Zero. Zero. Zero. I have zero as well. And I have listed that they did not provide an attachment or anticipated no in that field. Okay, under the next section affordable units brought online for option one, we have a option for a max of 20 points. But for the 10 point option, under scope of work, the number of units that are current currently uninhabitable will be restored to habitable through the rehabilitation must be at least one and less than the total number of the units in the development. For 20 points, it would be all of the units in the development. That's zero. Zero. Zero. Zero. Zero. Zero. I have zero as well. And they had listed a zero on their application for the number of units. Thank you. Option two for a total of 20 points. Excuse me. The second option for affordable units. One and two must be true. The first is 100% of the units in the current development are at market rate and that the applicant is committed to meeting the county's minimum LMI household requirement. Zero. Zero. I have five for that. Zero. Zero. Zero. I have zero as well. They had both had to be true. And in their chart, it didn't say they had zero market rate. Yes, they did. Yes. Yes. Which doesn't mean to be able to meet our LMI requirements. But it was. Yeah. Yeah. Yeah. Yeah. I have read the note about meeting that first requirement. So. Wait. Are you changing your chart to zero? Yeah. I'll be right here. So it's zero. Okay. And then under the section preferences for accessibility improvement preferences for five points under the tab scope of work, which is tab four, the applicant committed to the requirements of the preference and provided documentation attachment seven that would show the price and the options for the improvements. For that one. I gave them five. Zero. Zero. Zero. I put five as well. I stated that they indicated yes. And while it didn't specify units specifically in the CNA, it did say that they will meet accessibility requirements. So I'm not sure if that is what that went off of two months. That makes sense. The CNA does state that they're going to maintain existing accessibility, but it did speak to mobility or sensory improvements. And we also said no unit converter use for accessibility, which is why I noted that there was no improvements on there. Because it's not specific, I would be okay with the zero for the score. Okay. And zero under the first preference. And for the last one, uh, reduced resident displacement for a total of five points, the under tab six project information, the entry shows that they will not require any kind of tenant relocation, any off-site relocation for relocation of 30% or more, or excuse me, or less of the unit total project. So that brings Arbor place apartments, uh, total score received to five points. Again, for the record for the first section of private readiness, they received a cumulative score of zero. Um, the affordable units brought online section was a cumulative score of zero, but for preferences, they did receive the five points bringing their total cumulative score to five points. The next vendor we're going to be taking a look at is Jonathan B. Anderson. Okay, we'll start with project readiness for a set for 10 points. Under the scope of work, the applicant provided the name of a qualified general contractor that they have identified. I have 10 as well. Under component two for 10 points, excuse me, for a maximum of 10 points, both have to be true. Under tab six, the applicant certified that they have the appropriate documentation. And under the attachment of the appropriate documentation, they have the permit ready or permits not required form. For five points, they have, uh, certified that they have attachment 12 and that the form provided is the application for permitting, excuse me, for permitting submitted form. I have 10. I have zero for that. I have zero for that. I have zero. I have zero as well. I saw that they have permits in there, but I was going by specifically the forms that were provided that we were saying that needed to be included in the file. That's also why I'm giving it there. It's permitted in there, so that's why I've come up to me. I agree. I feel like it could be open. Yeah, I think back then. So I didn't see anything that was signed specifically by a government employee signing off on it. There was an electronic submission of permitting like the city of Tampa. Um, and then, um, I also saw a submission. It was a copy of a submission for change of contractor, but I didn't see anything signed off officially by government, local government. So that's why I chose zero for that. It would give me zero. I'm fine with two. I mean, we got nothing. It works for me. Okay. So, uh, consensus is zero. We all have a consensus for zero? Yes. Correct. Thank you. Under the affordable units brought online, option one, again, it's for a maximum of 20 points. For 10 points, under the scope of work, the number of units that are currently unhabitable will be restored to how it will based on the rehabilitation for at least one of the, I'm sorry, at least one and less than the total number of units in development. And for 20 points, it would be for a total of all the units in development. I have 10 for that. I have 10 as well. I have zero. I have 10. I have 10. Two. I have 10 as well. So I wrote it as option one or option two. That's why I want the option two. That's maybe not something. Well, so I do have a one of these when I have a whole that's all we use. Check your case changing your score to 10. Yeah. Yeah. Okay. Okay. For option one, 10. Thank you. And then for option two, for a total of 20 points, the second option under affordable housing brought online, one and two must be true. A hundred percent of the units in the current development are market rate. And the applicant is committed to meeting the county's LMI requirement. I have 20. Zero. Yeah, I have 20 there. 20. I have zero. Option two, I have 10. Option two. It's only going to be 20. We have to have both of them true. So it was 20 points. I'm sorry. So that is 20 points. It should be 20 points. I have zero as well. In their matrix, they didn't have anything at current market rate. That's how I saw that. Yeah. That's one of the reasons I had 10, but we didn't have any. I thought it was already. That's super easy. It's out of six, I believe. It's not in the matrix. It didn't say it's out on the LMI. Yeah. They were already below market rate on the chart. Yeah. Right. So I think we might need to look at it. I think. So from the matrix that I remember seeing, it was that it was currently at market rate and the matrix that they put in was that them showing that they would put all those units to be at the county LMI. The chart that I am referencing, it says what their current status is. And under the column of current market rate, it had a zero in that column. And then it showed everything else and lower LMI. That's what I'm looking into. They didn't say it was current. It said it literally says current. It didn't say current or anything. That's what I, what I know. Do you have a document too? No, I, I knew it. That's what I wrote down. Are we allowed to share a document that she printed with the notes of the chart? Of course. Which one is this one for? Of course. This, this is what I was going to buy with the market value. This is on the instructions that this had to match that. And then this had to be a yes. And then, and my notes, I say that that was a zero. And that's all I said six, I believe. Yes. Yeah. I'm just saying. And I said zero then. When I put my look, this is fixed, I'm making the point. Based on that information. Yeah, I would give the points based on this information. Okay. There was this one too, but this is where you might be getting the zeros from because that one does say zero. But I, with the way the questions are, I don't think this is one that we've been using because you've been that one. This is the one that's showing that they're going to go to the market rate before else. So I can add two. Thank you. Thank you. Thank you. So 20 points under option two for quotable units is a consensus. Okay. Okay. And the last one for preferences. Accessibility improvement preference for a total of five points. On tab four scope of work, the applicant was committed to the requirements of the preference and provided the documents in attachment seven that show the pricing and the work for the mobility and sensory accessibility improvements. I have five for that one. I didn't give them five because they know something together. But one, two, they didn't speak about sensory. That's what we're going to do with the first one. They spoke about ADA, but they didn't speak about sensory. So I'm not giving zero a bunch of that. I didn't give them five for that. I gave them five. I gave them five. Zero. Zero. I did five, but to air this point, I agree that we are going based on the fix. Yeah. Everybody. Zero points for the first one of preference. And then the last one is the reduced resident displacement preference for five points under tab six. The entries show that the project does not require any form of tenant relocation, any offsite relocation or relocation at 30% or less of the total units in the project. Okay. Fine for that one. Fine. Fine. Fine. Fine. Fine as well. Fine as well. All right. I'll go back through the committee scores for Jonathan B. Anderson. Looking at the total points under project readiness. They had scored a 10 points. Total points under preferences. I'm sorry. The total points under affordable units brought online. Had a maximum of 20. And they received the 20 points. And total points under preferences. At a maximum of 10. They received five points. And this brought their cumulative total points received to 35 out of 50. And that being said, that will conclude today's meeting. So proposals, please monitor Yuna for future updates related to the solicitation. If there's nothing else, that will conclude the evaluation committee meeting for RFP 26-365-CDBG-DR, Notice of Funding Availability for Small Multifamily Rehabilitation Projects. Thank you all. See you soon. Stop it. Stop it. Stop it. Stop it. Stop it. Stop it. Stop it. Stop it. Stop it. Stop it. Stop it. Stop it. Stop it. Stop it. Stop it. Stop it. Stop it. Stop it. Stop it. Stop it. Stop it. Stop it.